Our Projects

A selection of recent projects showing the range and technical depth of our work.

Newmarket Hospital Community Diagnostics Centre

NEWMARKET, SUFFOLK

Demolition of an existing X-Ray facility to create a purpose-built, modern diagnostic centre.

The Newmarket Community Diagnostic Centre was developed for West Suffolk NHS Foundation Trust to expand access to local diagnostic services and improve patient pathways. The project involved demolition of an existing X-Ray facility and construction of a new purpose-built healthcare building providing modern imaging and diagnostic facilities.

Johns Slater and Haward provided the full mechanical and electrical design for the new facility, delivering a coordinated solution that supports clinical requirements while meeting current NHS energy and compliance standards. The building was designed as an all-electric facility, incorporating energy-efficient systems and renewable technologies to support long-term operational performance.

The completed centre provides modern diagnostic facilities for the local population, increasing imaging capacity while reducing reliance on acute hospital sites.

KEY FEATURES

  • All-electric building designed to support NHS decarbonisation objectives

  • HTM-compliant ventilation systems with integrated heat recovery

  • Resilient electrical systems including IPS and UPS supplies

  • Energy-efficient heating and cooling systems

  • Integration of renewable energy through roof-mounted photovoltaic panels

  • Close coordination with specialist diagnostic equipment suppliers

  • EPC Rating A

Construction Value £15m

Ipswich Hospital Urgent Treatment Centre & Emergency Department

IPSWICH, SUFFOLK

A new Urgent Treatment Centre and Emergency Department complete with mental health facilities.

This project delivered a new Urgent Treatment Centre and Emergency Department at Ipswich Hospital for East Suffolk and North Essex NHS Foundation Trust. The development included new clinical facilities alongside refurbishment works carried out within a live operational hospital environment, requiring careful coordination and phased delivery.

Johns Slater and Haward provided the mechanical and electrical engineering design across all phases of the project, developing systems to meet the technical and operational requirements of a modern healthcare facility. The design incorporated resilient infrastructure and HTM-compliant building services to support continuous clinical operation and long-term reliability.

The completed development provides modern urgent and emergency care facilities for the local population, improving capacity while supporting safe and efficient clinical operation.

KEY FEATURES

  • Multi-phase new build and refurbishment within a live hospital environment

  • HTM-compliant ventilation systems with heat recovery

  • Medical gas installations and specialist clinical services

  • Resilient electrical infrastructure including standby generation

  • IPS and UPS systems supporting critical clinical areas

  • Comprehensive lighting and controls including medical lighting

  • Integrated mechanical and electrical services design across multiple departments

Construction Value £36m

The Hold, Suffolk Archives

IPSWICH, SUFFOLK

A purpose-built archive facility designed to protect Suffolk’s historic records in carefully controlled environmental conditions.

Images from Munro Building Services

The Hold is a major cultural and archival facility developed through a partnership between Suffolk County Council and the University of Suffolk. Located on Ipswich’s regenerated Waterfront, the building provides secure long-term storage for Suffolk’s historic records alongside public exhibition, education and research spaces.

Johns Slater and Haward provided mechanical and electrical design from feasibility through to detailed specification, supporting the delivery of a highly controlled archive environment while maintaining energy efficiency. The design carefully balances strict temperature and humidity requirements with low-energy operation, contributing to the project’s BREEAM Excellent target.

The project required detailed coordination and a considered engineering approach to ensure long-term reliability and stable environmental conditions for sensitive archival material.

KEY FEATURES

  • Mechanical and electrical design from feasibility through to completion

  • Highly controlled temperature and humidity conditions for archive storage

  • Energy-efficient environmental control systems

  • Designed to support a BREEAM Excellent rating

  • BIM Level 2 coordinated design

  • Cultural facility including archive stores, public spaces and education areas

Construction Value £17m

Ipswich Regent

IPSWICH, SUFFOLK

Sensitive MEP design supporting the transformation of a historic theatre into a modern, accessible and energy-efficient venue.

The £3.45M redevelopment of the Ipswich Regent Theatre revitalises a prominent cultural venue while carefully preserving its historic character. The scheme delivers upgraded and more spacious public areas through the refurbishment of the grand foyer, Crush Hall and Circle Lounge, alongside new bar facilities, enhanced circulation routes and significantly improved accessibility, including lift access and a Changing Places facility.

As part of the works, modern mechanical, electrical and public health systems were sensitively integrated within the constraints of the Grade II listed structure. Low-carbon technologies, including air-source heat pumps and heat recovery ventilation, were introduced to improve energy efficiency, while bespoke feature lighting and intelligent controls enhance both the ambience and overall visitor experience.

KEY FEATURES

  • Period-effect feature LED lighting

  • Bespoke manufactured luminaires

  • Air-source heat pump (ASHP) hot water systems

  • Smart lighting control system

  • ASHP heating and cooling systems

  • Heat recovery ventilation systems

  • PAVA (Public Address and Voice Alarm) system

  • Aspirating fire detection systems

Construction Value £3.45m

Old Tooks Site Residential Development

IPSWICH, SUFFOLK

Redevelopment of a former brownfield site to deliver a sustainable mixed-tenure residential community.

The Old Tooks Site development transformed the former Tooks Bakery site in Ipswich into a new neighbourhood comprising 60 homes, including houses, apartments and accessible bungalows. Developed for Handford Homes, the scheme provides a mix of affordable and private rental accommodation while supporting local housing needs.

Johns Slater and Haward provided mechanical and electrical design services, delivering energy-efficient building systems that achieved Code for Sustainable Homes Level 4 and a 19% reduction in CO₂ emissions compared with Building Regulations requirements. Each property incorporates photovoltaic panels to support on-site renewable energy generation and reduce running costs for residents.

KEY FEATURES

  • 60 new-build homes including houses, apartments and accessible bungalows

  • Brownfield regeneration project

  • Mixed-tenure development for affordable and private rental housing

  • Code for Sustainable Homes Level 4 compliant

  • 19% reduction in CO₂ emissions over Building Regulations requirements

  • Dedicated photovoltaic (PV) arrays to all properties

  • Energy-efficient heating and hot water systems

Construction Value £10m

University of Suffolk DigiTech Centre

ADASTRAL PARK, MARTLESHAM, SUFFOLK

Creation of a state-of-the-art research, innovation and learning hub for digital technology and engineering students.

Developed through a collaboration between the University of Suffolk and BT, the DigiTech Centre provides advanced teaching, research and knowledge-transfer facilities within the Adastral Park innovation campus. The £9.6m development supports students within the School of Engineering, Arts, Science and Technology while also creating a solution centre for SMEs and local businesses.

Johns Slater and Haward delivered the full mechanical and electrical services design, providing the infrastructure required to support specialist digital technologies, research facilities and modern learning environments. The building incorporates energy-efficient systems, intelligent lighting controls and heat recovery ventilation to enhance occupant comfort and operational performance.

KEY FEATURES

  • Research and innovation hub for digital technology and engineering

  • Specialist facilities including AI computing and cyber security environments

  • Full mechanical and electrical services design

  • VRF air conditioning system with heat recovery ventilation

  • Intelligent lighting control system with occupancy and energy monitoring

  • Advanced power, data, security and life-safety installations

  • Flexible learning and collaboration spaces for students and industry partners

Construction Value £9.6m

Paxman Academy

COLCHESTER, ESSEX

Construction of a modern secondary school designed to support a growing student population and provide high-quality learning environments.

Paxman Academy was developed for Essex County Council as a new state-of-the-art secondary school on the site of the former Alderman Blaxhill School. The project involved demolition of the existing buildings and construction of a new four-storey teaching block with an adjoining sports facility and activity studio, creating capacity for up to 900 students.

Johns Slater and Haward provided mechanical and electrical design services from feasibility through to construction, delivering building services solutions that support occupant comfort, energy efficiency and long-term performance. Thermal overheating and daylight modelling were undertaken during the design process to ensure compliance with government standards and optimise the learning environment.

KEY FEATURES

  • New-build secondary school for up to 900 students

  • Four-storey teaching block with dedicated sports facilities

  • Full mechanical and electrical design and site monitoring services

  • Thermal overheating and daylight modelling

  • Hybrid ventilation systems

  • Energy-efficient LED lighting and controls

  • Designed to meet current government performance standards

Construction Value £14m